CHANNEL BOTTOM DEFORMATIONS ON SEMI-MOUNTAIN RIVERS AT THE BRIDGE CONSTRUCTING SITES (EAST HANDYGA AND ABAKAN RIVERS AS AN EXAMPLE)
https://doi.org/10.15356/0435-4281-2013-3-41-50
Abstract
Changeable regime of semi-mountain rivers i.e. alternation of calm flow during low water and turbulent flood strongly complicates the forecasting of river bed deformations which characterized by intensive dynamics. Hazardous channel deformations near the bridge under construction over river East Handyga and near the rebuilding bridge over river Abakan are described. Errors in the forecasting channel deformations had been made earlier due to the use of the old standard methods which do not take into account the horizontal deformations of the channel.
References
1. Vedomstvennye stroitelnye normy. Uchyot deformatsij rechnykh rusel i beregov vodoyomov v zone podvodnykh perekhodov magistralnykh truboprovodov (neftegazoprovodov). VSN 163-83 (Industrial construction standards. Considering of river bed deformations and water bodies coasts in the area of underwater crossing of main pipelines (oil-and-gas pipelines). VSN 163-83. Leningrad: Gidrometeoizdat (Publ.), 1985. 144 p. (In Russ.)
2. Standart organizatsii. Uchyot ruslovogo protsessa na uchastkakh podvodnykh perekhodov truboprovodov cherez reki. STO GU GGI 08.29-2009 (Company standart. Considering of river bed process in the areas of underwater crossing of main pipelines through rivers. STO GU GII 08.29-2009). St.Petersburg: Nestor-Istoriya (Publ.), 2009, 184 p. (In Russ.)
3. Rekomendatsii po regulirovaniyu potoka na mostoykh perekhodakh cherz reki s oseredkovym tipom ruslovogo protsessa (ostrovnogo tipa) (Recommendations concerning flow control on the bridge crossings over rivers with midstream sandbank type of riverbed process (island type). Moscow: Izd-vo TsNIIS (Publ.), 1977, 18 p.
4. Posobie k SNiP. 2.05.03-84 «Mosty i truby» po izyskaniyam i proektirovaniyu zheleznodorozhnykh i avtodorozhnykh mostovykh perekhodov cherez vodotoki (PMP-91). Korporatsiya «Transstroy». PKTItransstroy (Manual to the Uniform Building Code 2.05.03-84 “Bridges and tubes” concerning surveying and engineering of railroad and vehicular bridge crossings over water streams (PMP-91). Corporation «Transstroy»). Moscow: Izd-vo TsNIIS (Publ.), 1992, 411 p.
5. Makkaveyev N.I. Ruslo reki i eroziya v eyo bassejne (Riverbed and erosion in its basin). Moscow: Izd-vo AN SSSR (Publ.), 1955, 347 p.
6. Chalov R.S. Comparative analysis of riverbed processes on the mountainous, half-mountainous and plain rivers. Geogr. Prir. Res., 2008, no. 1, pp. 32–41 (In Russ.).
7. Popov I.V. Deformatsiya rechnykh rusel i gidrotekhnicheskoe stroitelstvo (Riverbed deformation and hydro engineering constructions). Leningrad: Gidrometeoizdat (Publ.), 1965, 328 p.
8. Kondratyev N.E., Popov I.V., Snishchenko B.F. Osnovy gidromorfologicheskoj teorii ruslovogo protsessa (Basics of hydromorphological theory of riverbed process). Leningrad: Gidrometeoizdat (Publ.), 1982, 272 p.
9. Stroitelnye pravila. Opredelenie osnovnykh raschyotnykhgidrologicheskikh kharakteristik. SP 33-101-2003 (Construction regulations. Defining of basics hydrological calculated characteristics. SP 33-101-2003). Moscow: Gosstroy Rossii (Publ.), 2004, 74 p.
10. Chalov R.S. Ruslovedenie. Geografiya, teoriya, praktika. T.1. Ruslovye protsessy: factory, mekhanizmy, formy proyavleniya i usloviya formirovaniya rechnykh rusel (Riverbed studies. Geography, theory, practice. V. 1. Riverbed processes: factors, mechanisms, forms of appearance and formation conditions of river beds). Moscow: Izd-vo LKI (Publ.), 2007, 608 p.
11. Leopold L.B., Wolman M.G. River channel patterns – braided meandering and straight. US Geol. Surv. Prof. Pap., 1957, v. 282-B, pp. 1–85.
Review
For citations:
Reznikov P.N. CHANNEL BOTTOM DEFORMATIONS ON SEMI-MOUNTAIN RIVERS AT THE BRIDGE CONSTRUCTING SITES (EAST HANDYGA AND ABAKAN RIVERS AS AN EXAMPLE). Geomorfologiya. 2013;(3):41-50. (In Russ.) https://doi.org/10.15356/0435-4281-2013-3-41-50